| Posted on April 5, 2010 at 12:08 PM |
Our new stone pathway (Phase 1) was completed in November 2009 and it looks fantastic!! Phase 2 began April 12th and now boasts a gorgeous pathway around the eastern side of the cottage and waterfront. The new fire-pit and seating area provides a fabulous place to see the lake from two vantage points. Be sure to see our photos!
Categories: Life at the Cottage